Builder Information & Forms
The Arbors at Dogwood Creek deed restrictions (CC & R'S) requires all construction in this subdivision be subject to approval of the Arbors Architectural Control Committee including - but not limited to - new homes, out buildings, room additions, fences, patios, pools, decks, and mailboxes.
ACC and Builder Documents can be found in the following link. View Community Documents.
Plans for construction must be submitted and approved in advance of beginning work.
All builders must supply a Builders Bond and a signed Community Protection Agreement.
Please send construction plans and any questions to:
Goodwin & Company
Attn: Arbors at Dogwood Creek
11950 Jollyville Road
Austin, TX 78759
512-502-7500
Pre-Plan Info
Before a plan is submitted for approval on a lot, there may be other types of activity in preparation for the building project. These activities may include, but are not limited to: perk tests, lot clearing, and utility installations.
Pre-Plan Approval Requirements
A. ACCESS: If the lot is to be accessed by trucks or large equipment for lot clearing, perk tests or other pre-plan activities, the owner must submit for and receive approval for the installation of the temporary driveway to be used to access the lot for the duration of the project until the permanent driveway is installed.
B. DRIVING OVER THE RIGHT-OF-WAY: The 60 foot road right-of-way, measured from one lot pin - across the roadway - to the opposite lot pin is Arbors Association property. For erosion protection of Association property, this right-of-way may not be driven across nor parked on; lot access must only occur across the temporary driveway, which must be properly installed before pre-plan activities begin.
Access to any lot across the right-of-way that damages the right-of-way, in any way, will result in a fine for the lot owner. (Note: Arbors underground utilities are located in the approximate center of the right-of-ways)
All vacant lots are private property; do not use adjacent lots to access a building site.
C. PARKING ON THE RIGHT-OF-WAY: Parking of vehicles of any sort is allowed within 2 feet of the pavement. Parking is never allowed past the two feet allowed on the right-of-way, which occupies the space between the pavement and the owners lot. Damage to the right-of-way, in any way, will result in a fine for the lot owner.
D. FIRES: No clear burning of any lot. This ban includes the burning of trees, brush, and debris resulting from the clearing for home construction. Clear burning on any lot will result in a fine for the lot owner.
A builder's bond must be secured before work:
All Builders (Contractors) must supply: A valid Builders Bond** for $10,000.00 (or as notified), indicating coverage for any damage caused to the common areas of this subdivision.
Note that for construction projects on improved properties, auto or general liability coverage cannot be substituted for a bond.
The Arbors bond requirement is for a Surety bond . It protects the Arbors Community from damages by a contractor (or sub-contractor) that is not repaired by the contractor. In such cases, the Arbors will file against the bond to collect the repair costs.
In addition, builders must sign a Community Protection Plan and Compliance Agreement which is available by here.
Concrete Pour Plan
Fill out a Concrete Pour Plan and Checklist to get approval before the pour. The document can be found here.
Plan Submittal Requirements
All Builders (Contractors) must supply:
A valid Builders Bond** for $10,000.00 (or as notified), indicating coverage for any damage caused to the common areas of this subdivision.
The signed "Compliance Agreement"
List of contractors with names and builder contact information.
Site Plan:
Lot number and street address.
Copies of the Bastrop County Sanitation and Construction permits.
All proposed improvements.
House shape to scale with easements and setbacks, and driveway location.
Exact square footage.
Drainage plan so tract will drain to front and rear only. (Please Show burms, retaining walls, ditches, swales, and etc.).
Blue Prints (detail Info):
Foundation Plan - Show all grades, driveways, steps, sidewalks, and etc.
Elevations - Submit clearly drawn elevations showing front, rear, and both sides including garage.
Floor Plan - Drawn to scale showing all rooms so as to meet the minimum square. footage required and accurately show the layout of the house indicating the total climate controlled area and the attached garage.
Color Scheme - Submit a sample of the masonry, roofing, and trim color, using photos, pictures, paint chips or other "small" means. (Note: Full size bricks, rocks, shingles, etc, are not required nor desired.)
Masonry - the Arbors CC&R's require a minimum percentage of masonry on any home. Please provide information regarding the percentage of masonry to be used on each building.
Landscape: No formal landscape plan is required; however, the job site must be cleaned of all construction and lot clearing debris within 60 days of completion of construction.
Lot Slope and Drainage - Careful consideration should be given to the selection of a house plan to fit your actual tract and to the drainage plan. Pools, ponds, and sprinkler systems must be submitted for approval, so as not to interrupt the integrity of the developments natural drainage system.
Fencing - materials to be used, and location.
Driveway - materials to be used.
Mailbox - materials to be used, and location
Subdivision Culverts
The tables below are culvert specifications by lot:
ARBORS AT DOGWOOD CREEK
DRIVEWAY CULVERT TABLE
Please Note: This table is provided as a convenient reference only. Final driveway culvert diameter determination is made by the Arbors Architectural Control Committee (ACC) and the county. Please contact the ACC or the county commissioner for final determination.